The project consists of four project stages for the operator's various mines. Wear protection solutions include ABRESIST pipelines which are lined with ABRESIST cast basalt for transporting tailings pulp from the mine’s filtration systems. The diameter of the pipelines is 10, 12 and 14 inches, the total length of the pipes supplied is around 2110 meters.
In addition, 15 distributors and 2 silos for the Tailings Filtration System with a total area of more than 130 m² are lined with KALOCER aluminum oxide ceramics.
Kalenborn do Brasil with major order for ABRESIST pipes, distributors and silos for mines
